Ferroli 0RGE01XA Manual De Instalación Y Usuario página 61

Idiomas disponibles

Idiomas disponibles

5.3 Installation room
TP3 COND boilers must be installed in dedicated rooms, meeting the current Technical Standards and Legislation and equipped with ade-
quate ventilation openings. The ventilation openings must be permanent, communicating directly with the outside and located at the top and
bottom in accordance with current regulations. The location of the ventilation openings and the fuel supply, electricity and lighting circuits
must comply with the regulations in force according to the type of fuel used. To facilitate cleaning the smoke circuit, at the front of the boiler
there must be a free space of at least the length of the boiler body and, in any case, never less than 1300 mm; it is also necessary to check
that, with the door open 90°, the distance between the door and the adjacent wall (fig. 6) is at least equal to the length of the burner.
The boiler support surface must be perfectly horizontal. It is advisable to provide a flat cement plinth able to take the total weight of the boiler
plus the water. For the plinth dimensions, see the dimensions P x D (see table on pag. 52). If the burner is fed with fuel gas of specific
weight greater than that of the air, the electrical parts must be placed more than 500 mm above the floor. The appliance cannot be installed
outdoors because it is not designed to operate outside and does not have automatic anti-freeze systems.
INSTALLATION IN OLD SYSTEMS OR SYSTEMS TO BE UPGRADED
When the boiler is installed in old systems or systems to be upgraded,
make sure:
• The flue is suitable for the fume temperatures, calculated and built according to the current Regulations, and that it is tight, isolated, and
has no occlusions or constrictions.
• The electrical system is carried out by qualified personnel in compliance with the current Regulations.
• The fuel supply line and possible tank comply with the current Regulations.
• The expansion vessel is adequate for the expansion of the fluid in the system.
• The capacity, head and flow direction of the circulating pumps are appropriate.
• The system is washed, cleaned of sludge and scale, vented and tight.
• A feed/replenishing water treatment system is provided (see reference values).
60
EN
fig. 6 - Installation room
cod. 30902850 - Rev 06 - 04-2022
TP3 COND
loading

Este manual también es adecuado para:

Tp3 cond 65Tp3 cond 100Tp3 cond 150Tp3 cond 230Tp3 cond 370Tp3 cond 500 ... Mostrar todo