Trane Mitsubishi Electric TURYH-AN40AN Serie Manual De Instalación página 14

Idiomas disponibles

Idiomas disponibles

(3) When there are overhead obstacles
≥ 240 (9-1/2)
≥ 45°
≥ 50 (2)
7-2. Multiple unit installation
・When installing multiple units, make sure to take into consideration factors such as providing enough space for people to pass through, ample
space between blocks of units, and sufficient space for airflow. (The areas marked with Ⓐ in the figures below must be left open.)
・In the same way as with the single unit installation, add the dimension that exceeds the height limit (shown as "h1" through "h3" in the figures) to
L1, L2, and L3 as shown in the tables below.
・If there are walls in the front and rear of the block of units, up to six units can be installed consecutively side by side, and a space of 1000 mm
(39-3/8 in) or more must be left between each block of six units.
・When the amount of drain water is excessive, drain water comes out of the outdoor unit along the panel during heating operation.
(1) Side-by-side installation
When the distances between the units (L4) need to be small
L4
h1
Unit height
Required minimum distance [mm (in)]
L1 (Front)
450 (17-3/4) + h1
(2) Face-to-face installation
When there are walls in the front and rear of the block of units
h1
Unit height
Required minimum distance [mm (in)]
L1 (Front)
450 (17-3/4) + h1
WT09117X05
h2
Unit height
L2
L1
L2 (Rear)
L4 (Between)
450 (17-3/4) + h2
30 (1-3/16)
h2
Unit height
L2
L4
L4
L1
L2 (Rear)
L4 (Between)
300 (11-13/16) + h2
450 (17-3/4)
≥ 1000 (39-3/8)
Air outlet guide
(not supplied)
When the distance behind the block of units (L2) needs to be small
L4
h1
Unit height
Required minimum distance [mm (in)]
L1 (Front)
450 (17-3/4) + h1
When there is a wall on either the right or left side of the block of units
h3
Unit height
L3
Required minimum distance [mm (in)]
L3 (Right/Left)
30 (1-3/16) + h3
GB-12
h2
Unit height
L2
L1
L2 (Rear)
L4 (Between)
300 (11-13/16) + h2
450 (17-3/4)
L4
L4
L4 (Between)
450 (17-3/4)
loading