Connection of CT current transformers in the three-phase
3.
device.
The voltage is read directly, while the current is measured via
the external current transformers.
The current transformers are already wired. They must be
installed on the cables of phases L1, L2 and L3, just after the
IGA, making the arrow match the direction that the current
follows in the installation when energy is fed into the network:
from the loads to the connection.
GRID
P1
Pin
CT pin
5
S1
6
S2
7
S1
8
S2
9
S1
10
S2
Fig. 9. Wiring diagram of CT current transformers.
Power cables not supplied: 0.3 m mains cable (L1, L2,
L3, N), 1.5 mm
USER MANUAL
CONSUMPTION
P2
IMPORTANT: respect the
Cable code
order of phases L1, L2, L3
L1 cable
L2 cable
L3 cable
cross section.
2
71
SLC ENERGY MANAGER ENERGY METER