6.3. POWER SUPPLY FOR THE DEVICES.
6.3.1. SLC ENERGY MANAGER power supply.
The SLC ENERGY MANAGER device will constantly
record the energy that is consumed from or fed into
the grid, working in a similar way to the utility meter. It will
also be responsible for transmitting the data provided by the
EQUINOX2 solar inverter for display in the EQX-sun
application.
Power the SLC ENERGY MANAGER device.
1.
This element is the first to be installed after the IGA. Connect
as indicated in the following figure:
Power cables
not
0.30 m mains cable (L1,
L2, L3, N), 1.5 mm
section.
USER MANUAL
Very important:
supplied:
Respect the order
of the phases.
cross
2
Pin
Cable code
1
L1 cable
2
N cable
Attention:
Fragile con-
nector, maxi mum
tightening torque
0.1 Nm.
69
SLC ENERGY MANAGER ENERGY METER