Salicru EQUINOX SLC EM Lite Manual De Usuario página 63

Idiomas disponibles

Idiomas disponibles

6.2.3. General wiring diagram.
6.2.3.1. General wiring diagram SLC EM LITE
and SLC EM single-phase without Zero
Injection.
This diagram shows the wiring structure and composition of the
SLC ENERGY MANAGER device for the
phase inverter, without zero injection. The installation and wiring
must comply with local standards.
ICP
Legend abbreviations:
ICP
– Power control switch.
IGA
– Main circuit breaker.
ID
– Differential switch.
MCB
– Magnetic Circuit Breaker.
Fus.
– Fuses.
SPD
– Surge Protection Device.
PIA
– Small circuit breaker.
PV
– Photovoltaic panels.
SLC ENERGY MANAGER
monitoring and control device.
In order not to overload the dia-
gram, the earth cables have
only been represented at the earthing
connection points of the protection
devices, the inverter and the battery
system.
USER MANUAL
EQX2-S/SX
series single-
SLC ENERGY
MANAGER
IGA
CTs
Fus.
– Energy
SPD
PIAs
ID
ID
Inverter
MCB
63
SLC ENERGY MANAGER ENERGY METER
loading

Este manual también es adecuado para:

Equinox slc emEquinox slc em t