6. INSTALLATION.
6.1. MECHANICAL INSTALLATION.
In this section, the new devices are physically inserted into the
protection panel of the existing installation.
Materials required:
ICP
Fig. 4. DIN rail installation, single-phase model.
ICP
Fig. 5. DIN rail installation, three-phase model.
USER MANUAL
1
IGA
SLC ENERGY
MANAGER
IGA
Separate the IGA and ID protection elements, leaving
1.
a minimum separation of 48 mm between them.
Place the SLC ENERGY MANAGER device on the DIN rail of
2.
the installation's protection box in the separation space that
has been enabled.
In the direction from the connection to the installation, first
place the SLC ENERGY MANAGER device.
Ensure that the device has the DIN rail retaining tabs inserted
3.
correctly in the lower part.
ID
SLC ENERGY
MANAGER
PIAs
PIAs
ID
SLC ENERGY MANAGER ENERGY METER