6.2.3.3. General wiring diagram for three-phase
SLC EM without Zero Injection.
This diagram shows the wiring structure and composition of the
SLC ENERGY MANAGER device for the
phase inverter, without zero injection. The installation and wiring
must comply with local standards.
ICP
Legend abbreviations:
ICP
– Power control switch.
IGA
– Main circuit breaker.
ID
– Differential switch.
MCB
– Magnetic Circuit Breaker.
Fus.
– Fuses.
SPD
– Surge Protection Device.
PIA
– Small circuit breaker.
PV
– Photovoltaic panels.
SLC ENERGY MANAGER
monitoring and control device.
In order not to overload the dia-
gram, the earth cables have
only been represented at the earthing
connection points of the protection
devices, the inverter and the battery
system.
USER MANUAL
EQX2-T
series three-
SLC ENERGY
MANAGER
CTs
IGA
– Energy
Fus.
SPD
ID
PIAs
ID
Inverter
MCB
65
SLC ENERGY MANAGER ENERGY METER