Wolf VW30S Guia De Instalacion página 6

Idiomas disponibles

Idiomas disponibles

INSTALLATION
Installation
WALL HOOD
IMPORTANT NOTE: The hood is wired for an internal
blower. If an in-line or remote blower will be used, refer to
In-Line / Remote Blower Wiring on page 9.
If an internal blower will be used, install the blower prior
to mounting the hood. Refer to page 8 for internal blower
installation.
Mark the centerline for the location of the two mounting
1
holes using dimensions shown in the chart and illustra-
tion below. Additional wall framing is recommended
in this location. If wall framing is not available, the use
of wall anchors is recommended. Install the mounting
screws so there is approximately
the screw head and the wall. Position the two mounting
brackets for the chimney flue, then install using two
mounting screws per bracket. Refer to the illustration
below.
MOUNTING LOCATION
Black Hood
Stainless Hood
Glass Hood
CEILING
3 /4
"
(19)
1 /16
17
"
(433)
1 /8
9
"
(232)
A
BOTTOM OF HOOD
Mounting location
6 | Wolf Customer Care 800.222.7820
All manuals and user guides at all-guides.com
1
/
"
gap between
(6)
4
A
12
3
/
"
(324)
4
3
16
/
"
(416)
8
12
9
/
"
(319)
16
Place the mounting tabs over the mounting screws. Use
2
the leveling adjustment screws to ensure the hood is
level. Refer to the illustration below.
Place the backdraft damper on the round discharge then
3
install 6"
round metal ducting (not provided) to the
(152)
damper and seal with aluminum tape.
Mount the electrical box to the wall using the screws
4
provided.
Insert the power supply from the home and the cord
5
provided into the electrical box.
Make electrical connections and install the cover.
6
Insert the plug into the receptacle on the top of the hood.
7
Secure the upper chimney flue to the mounting brackets
8
using the screws provided. Refer to the illustration
below. Place the lower chimney flue over the upper, then
lower until it rests on the hood.
MOUNTING
TAB
LEVELING
SCREW
Mount and level hood
Install telescopic flue
loading