1. Using a screwdriver, remove the bolt and battery cover;
2. By pulling the rubber belt downwards, release the metal
buckle under the battery;
3. Remove the battery until the negative terminal is in sight.
Pull and clamp the black cable to the negative terminal;
The positive cable is already connected to the positive
terminal. However, check that it is properly clamped.
4. Place the battery inside the generator and tighten the
rubber belt;
5. Fit the battery cover and tighten the bolt.
1. Set the ESC switch to the "OFF" position (5B);
2. Set the 3 in 1 switch to the
▪ Active ignition circuit;
▪ Active fuel circuit;
▪ No air intake.
You don't need to set the 3 in 1 switch to CHOCKE
position to start a hot engine. Push the 3 in 1 switch
to the "ON" position
3. Pull the recoil starter slowly until it snaps into place,
then pull it quickly;
Hold the carrying handle (1A) firmly to prevent the
generator from falling off when pulling the recoil
starter.
4. After starting the engine, let it warm up until it does not
stop when the 3 in 1 switch returns to the
position.
Remark:
▪ When starting the engine, with ESC switch in the "ON"
position and there is no load in the generator:
▪ If room temperature is below 0°C, the engine will run at
3600rpm for 5 minutes.
▪ If room temperature is below 5°C, the engine will run at
3600rpm for 3 minutes.
▪ The ESC switch will operate normally after the above-
mentioned periods while it is on.
"CHOCKE" position (12B):
.
1. Set the ESC (5A) switch to the "OFF" position;
2. Disconnect any electrical device;
3. Set the 3 in 1 switch to the
▪ Ignition system is off;
▪ Fuel circuit is off.
The generator can supply emergency standby power to a
home when there is a power cut from the electrical grid.
When using the generator, its purpose is not to supply
power to all the appliances in the house, but rather, to what
is considered essential.
Connecting the generator to the building's electrical
system must be carried out correctly to prevent
damage to the generator and avoid the risk of accidents.
Wiring must only be carried out by a qualified electrician
or by individuals with training in electrical installations. The
generator must not be directly connected to the building's
electrical system without an isolating device (transfer
switch).
In case of power cut, whenever you connect the generator
to the electrical installation of a building to supply power,
you must turn off the main circuit breaker in the distribution
board.
Do not connect the generator to the electrical installation
of a building if it does not have a main circuit breaker,
installed by a qualified technician.
"ON"
If the main circuit breaker is not switched off, when
the mains power is restored, there may be return
current in the generator and cause:
▪ Electrocution of the user or others in contact with the
generator;
▪ Fire or explosion of the generator and fire in the
building's electrical installation;
The generator must not be switched on or connected to
other power sources.
You must switch off the generator before you reset the main
circuit breaker to use the mains electricity again.
"OFF" position (12B):