N
Period
1 Before using
2 Before using
3 Once a year
4 Once a year
Once a year
5
(CEILING VERSION)
Once a year
6
(FLOOR VERSION)
Operation and
maintenance manual
7.4 Routine maintenance
Interrupt the power supply before doing any maintenance jobs.
Make sure there are no pieces or fragments of paint that could
become detached and fall within the operating field. If there are
any, remove them manually.
Make sure the light source protection screens are not damaged. If
they are, contact the Customer Service.
Check all the Product joints and make sure there are no noises or
squeaks. If there are, lubricate the clutches involved with suitable
grease for industrial use at a service temperature between -30°C
and + 120°C, type OKS 470 or with similar properties.
If the Product fails to maintain a regular position, adjust the
clutches as indicated at points 7.1 and 7.2 (arm and clutch
adjustment).
Make sure the bar retention screws (1) are tightened properly. Also
check the bar horizontal arm retention screws (4). If these are not
properly fastened, adequately tighten.
See drawing 200. To access the nuts (1), slide off the aluminium
ring (2) downwards by loosening the screws and bar cover (3).
See drawing 200. Floor version: Make sure the stem retention
screws (5) under the base are tightened properly.
If these are not properly fastened, adequately tighten.
MU_029_EN
Rev.0
Check Product integrity
Action
07/11/18
EN
Page 21 of 35