Draw a horizontal line where indicated at the bottom edge of the
3
vent hood at the desired height above the cooking surface.
Place a bracket
B
on the wall as shown about 1/8" from the ceiling
or upper limit, aligning the centers(notch) with the vertical reference
line and mark the wall at the centers of the holes in the bracket.
Place the second bracket
B
on the wall as shown, below the first
bracket, at the height of the upper chimney section supplied and
aligning the centers (notch) with the vertical line.
Attention: If the position of the second bracket
B
below the first
bracket is less than 19 1/2" from the horizontal reference line (at the
bottom of the hood), then the second bracket cannot be attached.
Mark the wall at the centers of the holes in the bracket and mark the
point 1 and 2 for the Hood Body installation as show (16 9/16" from
the horizontal line and 4 9/16" from the vertical line).
Drill ø 5/16" holes at all the centers points marked (point 1,2,3,4,5,6)
as shown.
B
D
x6
x6