Care And Maintenance; Spraying The Mechanical Parts - B.A. International BA45 Instrucciones De Uso

Ocultar thumbs Ver también para BA45:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6453505.book Seite 37 Donnerstag, 21. April 2016 4:59 16
Operating Instructions BA ULTIMATE Kit
64 53 505 D3551.201.04.02.02
7

Care and maintenance

Elastomers, e.g. O-rings, must be replaced depending on their degree
Care and maintenance
Replacing elastomers
of wear.
Check the clamping system annually for safety reasons.
Testing the clamping system
7.1

Spraying the mechanical parts

Intervals
Spraying the mechanical parts
● At least every noon and evening
Daily at noon and in the evening
● Prior to each sterilization
● After each thermodisinfection
● During a longer preparation (> 10 minutes)
Longer preparations
7 Care and maintenance
37
Tabla de contenido
loading

Este manual también es adecuado para:

Ba175Ba605Ba606Ba695fbBa695fm

Tabla de contenido