Installation
7.
Route and secure line voltage wires
(black & white) with the power cord.
Wires must enter control box through
line voltage Heyco fitting and attach to
L1 and L2 contactor terminals.
Connect to
L1 & L2 of
Contactor
8.
Reinstall bin, wire connectors and all
panels, then test run. A noticeable
draft will be emitted from the upper
hose adapter during operation.
20
Ice Beverage (IB) Single Evaporator
Model Installation
Disconnect power to ice machine at the
electrical disconnect. Pressing the power
button does not disconnect line voltage.
1.
Disconnect all power to the ice
machine at the electrical disconnect.
2.
Install tubing adapters into bulkhead:
• Remove dust cover from top of
evaporator to expose space between the
evaporator and bulkhead.
• Remove and discard plastic caps to allow
installation of tubing adapters.
• Install the longer tubing adapter in
the upper evaporator compartment
bulkhead location.
• Install the shorter tubing adapter in
the lower evaporator compartment
bulkhead location.
Part Number: 000014110 Rev 01 1/19
Section 2
Warning