Installation; Installing The Batteries; Connecting A Sensor; Fitting The Wrist Strap - Mettler Toledo SevenGo Duo pro SG68 Instrucciones De Manejo

Ocultar thumbs Ver también para SevenGo Duo pro SG68:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3 Installation

Carefully unpack the meter. Keep the calibration certificate in a safe place.

3.1 Installing the batteries

NOTICE
Damage to the instrument due to the unsealed battery cover
The IP67 rating requires the battery compartment to be perfectly sealed. The sealing ring around
the battery cover must be replaced if it is damaged in any way.
1 Slide the release button on the battery cover in the direction of the arrow.
2 Hold the lid with two fingers and remove it.
3 Insert the batteries in the battery compartment, as indicated by the arrows on the inside of the compartment.
4 Replace the battery cover and push back the button to fix the lid in place.

3.2 Connecting a sensor

IP67 sensors
To connect the IP67 sensors, make sure that the plugs are properly inserted. Twist the RCA (Cinch) plug to
ease the attachment of the sensor.
®
ISM
sensor
When connecting an ISM
calibration data to be transferred automatically from the chip of the sensor into the meter and is used for further
measurements. After attaching the ISM
The meter must be switched on.
(If the meter is already switched on) the READ key is pressed.
(If the meter is already switched on) the CAL key is pressed.
We strongly recommend you to switch off the meter when disconnecting an ISM sensor. In doing so, you make
sure that the sensor is not removed while the instrument is reading data from or writing data to the ISM-chip of
the sensor.
The ISM icon
display.

3.3 Fitting the wrist strap

6
Installation​ ​
®
sensor to the meter, one of the following conditions have to be met for the
®
sensor ...
appears on the display and the sensor ID of the sensor chip is registered and appears on the
Fit the wrist strap as shown in the diagram.
SevenGo Duo pro™
Tabla de contenido
loading

Tabla de contenido