Recycling And Disposal; Customer Service - Vaillant VPV P Serie Instrucciones De Funcionamiento, Instalación Y Mantenimiento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Operating instructions
a
7

Recycling and disposal

Disposing of the packaging
> As the competent person, dispose of the packaging cor-
rectly.
> Observe all relevant regulations.
If the product is labelled with this mark:
> In this case, do not dispose of the product with the
household waste.
> Instead, hand in the product to a collection centre for
waste electrical or electronic equipment.
8

Customer service

The contact details for our customer service are provided in
the Country Specifics appendix or on our website.
0020329424_00
Installation and maintenance instructions
For the competent person
1
Product description
See operating instructions and/or title page
2
Set-up
2.1
Transporting the photovoltaic module
> Where possible, carefully transport the photovoltaic mod-
ule in its packaging.
> Avoid bumping, knocking or pushing the surface, the
edges, and the corners of the glass panels.
> Transport the photovoltaic module upright.
> Carry the photovoltaic module with the help of a second
person. Hold the modules by the long sides when doing
so.
> Wear clean and soft gloves.
> Do not exert tension or pressure on the connection
boxes or the cabling.
2.2
Storing the photovoltaic module
> Always store the photovoltaic module in a dry, padded
location.
> Always store the photovoltaic modules upright.
> Secure each photovoltaic module against toppling over.
> Do not stack the photovoltaic modules.
2.3
Unpacking the photovoltaic module
> Carefully remove the packaging and padding. Do not use
any pointed or sharp objects.
2.4
Checking the scope of delivery
Number
Designation
1
Photovoltaic module
2.5
Checking the mounting frame
> Ensure that the mounting frame has been aligned and
installed in accordance with the planning requirements
and set-up instructions (images 7, 8 and 9).
2.6
Correctly guiding the mounting rails
See appendix A, „Installation drawing"
2.7
Requirements for the installation site
– No heavy soiling expected
– No shading
– Maximum permissible suction and pressure loads, see
appendix A, „Installation drawing"
2.8
Preparing the installation
> Before you start installing the modules, prepare the elec-
trical installation.
2.9
Checking the photovoltaic module
> Before installing each photovoltaic module, check its
mechanical integrity.
> Do not set up and install damaged components.
9
en
Tabla de contenido
loading

Tabla de contenido