Concluding Work; Recycling And Disposal; Collectors; Packaging - Vaillant auroTHERM VFK 125 Manual De Instrucciones

Ocultar thumbs Ver también para auroTHERM VFK 125:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7

Concluding work

Based on the following table, make sure all work steps
have been performed.
Step
1 For flat roof installation: frames fixed with retaining pin and safety clip
2 For flat roof installation: gravel trays filled/frames anchored
3 All connections fixed with clamps
4 Hydraulic connections laid correctly
5 Collector sensor VR 11 connected
6 All clamping elements tightened
7 Collectors connected to lightning protection device (optional with lightning protection device)
8 Pressure test (ideally with air pressure) carried out, all connections tight
Table 7.1 Final operations
h
Note
After commissioning and in seasons when there
are wide outside temperature fluctuations, con-
densate can form in the collector.
This is normal.
h
Note
Reflections caused by irregularities of the glass
are typical of the material.
8

Recycling and disposal

The raw materials used to manufacture the units and
transport packaging are to a large extent recyclable.
Please observe the applicable national legal regula-
tions."
8.1

Collectors

The collectors must not be disposed of in the household
waste.
All materials can be fully recycled, sorted according to
their respective types and grades and brought to the
local recycling facility. Make sure that the collectors are
disposed of properly.
8.2

Packaging

The transport packaging will be disposed of by the ex-
pert technician who installs the units.
8.3

Solar fluid

The solar fluid must be disposed of in accordance with
the local regulations, e.g. a suitable landfill site or incin-
erator plant.
Installation manual auroTHERM 0020057143_04

Vaillant Customer Service and warranty 9

Uncontaminated packaging can be reused. Dispose of
packaging that cannot be cleaned in the same way as
for solar fluid."
9
Vaillant Customer Service and
warranty
9.1

Vaillant warranty

Vaillant provides a full parts and labour warranty for
this appliance.
The appliance and all associated pipe work and controls
must be installed by suitably competent persons in ac-
cordance with all current and relevant safety, building
control and planning regulations and in full compliance
with the manufacturer's instructions.
All unvented domestic hot water cylinders must be in-
stalled by a competent person to the prevailing building
regulations at the time of installation (G3).
Terms and conditions apply to the warranty, details of
which can be found on the warranty registration card in-
cluded with this appliance.
Failure to install and commission this appliance in com-
pliance with the manufacturer's instructions may invali-
date the warranty (this does not affect the customer's
statutory rights).
9.2

Vaillant Service

To ensure regular servicing, it is strongly recommended
that arrangements are made for a Maintenance Agree-
ment.
Please contact Vaillant Service Solutions
(0870 6060 777) for further details.
Concluding work 7
Recycling and disposal 8
GB
27
Tabla de contenido
loading

Tabla de contenido