Complete The Installation - Kohler Dual Opto 1103128 Instrucciones De Servicio

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Motor Wiring Loom
Connect the Wiring Looms
Connect the motor (2 connections), solenoid, and thermistor
wiring looms to the circuit board.
Verify all connectors and grommets are secured.

Complete the Installation

IMPORTANT! Position the wiring looms so that they are not
pinched when the cover is secured.
Install the case inserts and cover using the new screws provided.
Reconnect the inlet and outlet connections.
Connect the power supply and turn on the water supply.
Check for leaks.
Enter the calibration code into the user interface. Path: Settings >
Valve > Service > Activation Code (1012)
1117891-9-B
Solenoid Wiring Loom
Motor Wiring Loom
Second Connection
(not all models)
Thermistor Wiring Loom
Circuit Board
14
Kohler Co.
Tabla de contenido
loading

Tabla de contenido