1. BEFORE YOU BEGIN
HOW TO USE THESE INSTRUCTIONS
These instructions contain important
information. Please leave instructions for the consumer.
MODEL NUMBERS
S K-300
S K-P300
S K-300-KR (for Finished Deck Rim Mounts Only)
PRODUCT REQUIREMENTS
S
Deep rough-in kit #73444 allows an additional 1/2"
(1.3cm) of tile thickness.
S
Plaster guard diameters are approximately 1-5/8"
(4.1cm) for the valve and 7/8" (2.2cm) for the spout.
S
Installer-supplied copper tubing to be: 5/8" O.D.
(1/2" nominal).
S
Install water hammer arrestors in supply lines near
the valves.
ROUGHING-IN DIMENSIONS
X = Distance from centerline of spout inlet to front of spout
base plus 1/2" (1.3cm).
Y = Distance between valve centerlines vary. Check
handle and spout installation instructions for exact
dimensions.
* Dimension allows for 1/4" (6mm) handle adjustment
during handle trim installation.
A
1013511-2-
R
installation
1/2" HIGH-FLOW DECK/RIM
MOUNT BATH VALVE
S K-P300-KR (for Finished Deck Rim Mounts Only)
S K-300M
S K-P300M
INSTALLER INFORMATION
S
These
instructions
installation: installation on finished deck or rim, and
installation on rough (unfinished) deck (to be
covered later with tile or other finish material).
S
Leave protective sleeve on spout supply tube until
spout installation. This is an O-ring sealing surface
which may be damaged when unprotected.
S
Finish deck material must fit closely to the
diameters of the plaster guards, especially the
spout plaster guard.
S
Provide an access panel to valves from underside
of deck.
Diameter of hole in deck for spout = 1-1/8" (2.9cm) Max.
Diameter of hole in deck for valve = 1-1/2" (3.8cm) Max.
Thin deck/rim installations require additional support
under deck/rim. Use 1/2" exterior grade plywood.
For installations on a rough (unfinished) deck to be
covered later with tile, the tile thickness must not exceed
1-1/4" (3.2cm).
cover
two
methods
of
E2002 Kohler Co.