To use the equipment in both these configurations it is neces-
sary to set the parameter P12 = 2 and P16 = 2 (see par. 7.1).
20
19
18
OUT
IN
21
M
20
19
18
OUT
IN
84
EN
24
5
3
8
2
1
fig. 20
5
3
2
1
fig. 21
cod. 3541T600 - Rev. 04 - 05/2020
EGEA
200 LT-S - 260 LT-S - 200 LT - 260 LT
Legend (fig. 19, fig. 20 and fig. 21)
1 Cold water inlet
2 Solar coil outlet
3 Solar coil outlet
4 Recirculation
5 Hot water outlet
8 Solar thermal coil
10 Drain valve
16 Recirculating pump
17 Check valve
10
18 Automatic thermostatic
mixing device
* We advise to use solar collector probe PT1000 (cod.
22
FERROLI - 043007X0)
5.7 Electrical connections
The product comes already wired for the mains supply. It is
powered via a flexible cable and a combination plug/socket (fig.
22and fig. 23). For connection to the mains, a Schuko socket
with ground and separate protection is required.
ATTENTION!: The power supply line to which the
equipment will be connected must be protected
by a suitable differential switch.
The type of differential must be chosen accord-
ing to the type of electrical devices used by the
overall plant.
For the mains connection and the safety devices
(e.g. differential switch), comply with IEC stan-
24
dard 60364-4-41.
fig. 22 - Schuko socket
8
19 Solar collector
20 Solar collector probe
(PT1000 not supplied*)
21 Solar collector shutter
22 DHW puffer
23 Solar coil probe
(not supplied)
24 Heat pump
A Probe holder
fig. 23 - Unit plug