Starting Screen; Test Screen; Main Screen - voestalpine Bohler URANOS 2700 MTE Instrucciones De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 126
8
Synergy
Lets you select a preset welding program (synergy) by
choosing a few simple settings:
- wire type
- gas type
- wire diameter
9
Programs
Allows the storage and management of 64 welding
programs which can be personalised by the operator.

3.3 Starting Screen

When switched on, the generator performs a succession of
checks in order to guarantee the correct operation of the system
and of all the devices connected to it.
At this stage the gas test is also carried out to check the proper
connection to the gas supply system.

3.4 Test screen

When the side panel (coil compartment) is open, the welding
operations are inhibited.
The test screen appears on the LCD display.
1
Wire feed
2
Gas test
3
Wire speed
Allows the regulation of the wire feed rate.
Minimum 0.5 m/min, Maximum 22.0 m/min,
Default 1.0m/min
4
Side panel open
5
Heading
Allows the display of certain pieces of important infor-
mation relating to the selected process.

3.5 Main Screen

Allows the control of the system and of the welding process,
showing the main settings.
MMA
TIG DC
MIG/MAG
41
Tabla de contenido

Solución de problemas

loading

Tabla de contenido