Ugolini Mini GEL Manual De Servicio página 18

Ocultar thumbs Ver también para Mini GEL:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Where the copper tube is protected by an insulation grip, the leak can be detected from both ends of each individual grip.
Referring to figure 4, proceed as follows:
1 Begin the inspection at the "High Pressure" zone (discharge) of the compressor. Check around the seals.
2 Follow the copper pipes to the condenser and check the sealed connections at the condenser entrance and exit.
3 Also check the curves of the pipes on both sides of the condenser.
4 Follow the copper pipes to the evaporator, checking around the sealed connections on the dehydrator filter and the
electrovalves.
5 Disassemble the geared motors and check the evaporator capillary tube entry and the suction line outlet.
6 Check the copper pipes up to the compressor.
7 Inspect the "Low Pressure" zone of the compressor, checking the connections on the suction and inlet pipes.
Incorrect adjustment of the Production Parameters may compromise the opera-
tion of the machine.
8 Once the leak has been identified, seal it and charge with gas according to the instructions below.
9. 2 HOW TO EMPTY THE CIRCUIT
1 Remove all the machine's panels.
2 Remove the cap from the "Charge" pipe valve on the compressor.
3 Connect the compressor "Charge" tube to the "Low" filling unit on the "pressure Gauge" (see figure).
IMPORTANT
18
Tabla de contenido
loading

Tabla de contenido