Central Interface Module CIM4210
Minimum spacing
Natural convection must be possible above and below the
device. A clearance of 100 mm must be observed in both
cases.
Mounting the Central Interface Module (CIM)
(see Section A, Figure 2)
The Central Interface Module is screwed directly to the rack.
1
The fixing screws are screwed into the CIM in the
delivery condition. Unscrew these 6 fixing screws.
2
Connect the connector of the system interface to the
CIM
3
Place the CIM on the rack
screws
Removing the Central Interface Module (CIM)
(see Section A, Figure 4)
1
Withdraw all connectors from the terminals on the
front of the CIM.
2
Unscrew the six fixing screws
CIM.
3
Withdraw the connector of the flat cable to the
system interface
3
Central Interface Module CIM4310
Minimum spacing
Natural convection must be possible above and below the
device. A clearance of 100 mm must be observed in both
cases.
Mounting the Central Interface Module (CIM)
(see Section B, Figure 2)
1 Connect the CIM to the Power Output Module (POM)
using the four connection tabs.
2 Screw the four screws into place
Removing the Central Interface Module (CIM)
(see Section B, Figure 4)
Withdraw all connectors from the CIM.
1 •
Withdraw the connector of the system interface to
the POM.
2 Unscrew the four screws
from the POM
.
4
and mount it with the 6
and remove the
.
.
and disconnect the CIM
X1 / X2: PROFINET
(see Section A, Figure 1a)
Connect X1 / X2 to the higher-level controller and/or the
next PROFINET device using an Ethernet cable according
to the PROFINET specification.
X1 / X2; S1 / S2: PROFIBUS
(see Section A, Figure 1b)
Connect X1 to the higher-level controller and/or the next
PROFIBUS device via cable.
X2 is the service interface.
The PROFIBUS address is assigned using the S1 / S2
address selector switches.
X3: 24 V DC supply voltage
(see Section A, Figure 1)
+
+24 V DC
The plug connector for the 24 V DC
connection is included in the scope
-
GND
of delivery. Features: PUSH IN
spring-loaded terminal with release
catch, daisy chain cabling is
possible.
X1 / X2: PROFINET (see Section B, Figure 1a)
Connect X1 / X2 to the higher-level controller and/or the
next PROFINET device using an Ethernet cable according
to the PROFINET Specification.
X1 / X2; S1 / S2: PROFIBUS (see Section A, Figure 1b)
Connect X1 to the higher-level controller and/or the next
PROFIBUS device via cable.
X2 is the service interface.
The PROFIBUS address is assigned using the S1 / S2
address selector switches.
X3: 24 V DC supply voltage (see Section B, Figure 1)
+
+24 V DC
The plug connector for the 24 V DC
connection is included in the scope of
-
GND
delivery. Features: PUSH IN spring-
loaded terminal with release catch,
daisy chain cabling is possible.
Connecting the system interfaces on the front
(see Section B, Figure 2)
Connect the connection cable
interface
(X7) of the POM.
CIM4210 / CIM4310 PROFINET / PROFIBUS
of the CIM to the system
A5E33510853A/006, 01/2016
loading

Este manual también es adecuado para:

Hcs cim4310 profinetHcs cim4210 profibusHcs cim4310 profibus6bk1942-1aa00-0aa06bk1943-1aa00-0aa06bk1942-1ba00-0aa0 ... Mostrar todo