Installation & Assembly - Urrea BAL24 Manual De Usuario

Balanceadora de llantas
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ALU3
ALU3 aluminum alloy bal-
ance alloy mode key.
Apagado
Apagado
Emergency stop key.
Stop
Stop
Encendido
Encendido
Start key.
Start
Start
Interna
Interna
Inner unbalance value and pa-
Inner
Inner
rameter of the tire display.
Outer unbalance value and
Externa
Externa
parameter value of the tire
Outher
Outher
display.
Unbalance point positioning
lamp.
INSTALLATION & ASSEMBLY
Before installation and use of the wheel bal-
ancer, you should carefully read this instal-
lation and operation manual. And keep this
manual in hand for reference at any time. You
should be sure that all the operators have read
this manual to guarantee the most perfect
functions of the machine and meanwhile the
safety.
UNPACKING
Remove the upper cover of the package car-
ton and check and confirm the wheel balancer,
spare parts and documents you purchased ac-
cording to the packing list. If you have any
question, please contact with the dealer.
Package materials such as plastic, PBV, nail,
screw, timber and carton must be placed into
a scrap bin to treat according to the local regu-
lation.
INSTALLATION
Remove the connect bolt. And carry down the
wheel balancer to place it on the flat and solid
floor. We should store it indoor to avoid it from
being exposed to the sunlight for long time
and the moisture.
E N G L I S H •
• MAIN SHAFT INSTALLATION
Before installation, use the ethyl alcohol and
compressed air to clean up the center hole of
the shaft and connect part.
Use spanner and screw to fix
the thread shaft on the bal-
ance shaft.
ELECTRICAL CONNECTION & EARTHING
According to the label on the connect between
power cable and body, the power cable con-
nect socket must be grounded with the reliable
earth wire.
All the electrical devices installation must be
done by the qualified staff. Before installation,
please check If the power system is comply
with the technical parameter marked on the
nameplate of the machine.
The wiring of the machine must have the fuse
and the perfect ground protection. And in-
stall the electrical Leakage automatic controls
switch in the power source. And recommend
the application of the stabilizer if the voltage
of installation site is unstable.
WARNING: Any electrical connect in the
workshop is only done by the qualified techni-
cal staffs and it should meet the enforced regu-
lation and must be according to the following:
• Power on the data plate on the machine.
• Voltage decrease can not exceed 4% of the
rated voltage on the data plate when full load
(10% when start).
Operators must:
• Install the plug.
• install 30ma circuit breaker.
• install power cable fuse.
• provide with effective workshop electrical
connect to ground.
· Prevent the authorized operation and pull
out the plug to prolong the working life when
not use the machine.
· if the machine directly connected to the
power source through the power board not
the plug, we should use the qualified staffs to
operate.
WARNING: Perfect ground is necessary for
the correct operation. Do not connect the ma-
chine with air pipe, water pipe, telephone line
and the other unsuitable objects.
U se r's m a nua l
19
Tabla de contenido
loading

Tabla de contenido