SOMFY Passeo 500 Manual Del Usuario página 21

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

1
Electric connections
J Connect the antena.
For
an
optimal
functioning,
it
recommended to exit the box antenna
wire through a grommet :
Never cut the antena wire.
J Connecting the power supply cable.
For your safety, these operations must be done with power off.
Pass the wire in the stuffing box.
1
Connect the ground wire.
2
A ground wire (green/yellow) must be used for
certain accessories (lighting 230V- Class I).
Blue wire
The wiring colors must
Red/brown,black wire
be respected.
Green/yellow wire
Tighten the stuffing box. Pull on the
4
cable to check that it is correctly
blocked.
PROG
AUTO
ON/OFF
is
PROG
AUTO
ON/OFF
Connect the phase and the neutral.
3
Pull on the cable to check that it is
correctly blocked.
Neutral
Phase
PROG
Ground
AUTO
ON/OFF
Parametering your PASSEO/AXOVIA
2
I The steps:
J Presentation of the symbols.
J Parametering your PASSEO/AXOVIA.
J Using precautions for the automatic mode.
J Securization of parametering.
J Presentation of the symbols.
Maintain pressed
Press for 1
second / release
J Parametering your PASSEO/AXOVIA.
Before starting the parametering your installation, check that the ON/OFF and PROG
lights are lit and the DANGER
light is off. Do the following operations :
Functioning of the remote controle :
Your PASSEO /AXOVIA can function with one or several remote controls. The
operations described below must be repeated as often as there are remote controls
to memorize.
You can memorize one or two buttons on your remote control, each of the buttons
corresponding to a different functioning mode :
• Memorising a single button:
• Memorising two button :
Blinking light
Lit light
> total opening the 2 leafs.
> total opening the 2 leafs,
> pedestrian opening, only one leaf.
21
Tabla de contenido
loading

Este manual también es adecuado para:

Axovia 150 s

Tabla de contenido