Glacier bay F1AA0005BNV Guía De Uso Y Cuidado página 8

Ocultar thumbs Ver también para F1AA0005BNV:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation (continued)
4
Connecting the pipes
Apply sealant tape (G) on all threads.
Connect the water supply tubes to the valve
body (J). For soldering connections, remove
flammable parts prior to soldering.
Attach the vertical shower pipe and elbow to
the valve body (J).
Attach the vertical spout pipe and elbow to the
valve body (J).
For shower only installation, install the plug (K)
onto the bottom unused port.
G
6
Installing the tub spout
Apply sealant tape (G) on all threads.
Install a stub-out pipe (not included) for
the spout by using an adjustable wrench to
tighten.
The proper length of stub-out pipe will ex-
tend 1.5 to 2 in. beyond the finished wall.
Slip the tub spout (F) onto the stub-out pipe
pointing up and slightly tighten the set screw.
Rotate the tub spout (F) to final position and
fully tighten the set screw in place.
J
G
8
5
Installing the shower
Wrap the threads on the shower arm (B) with
sealant tape (G).
Thread the shower pipe arm (B) through the
shower arm flange (I), and screw the shower pipe
arm (B) onto the vertical shower pipe elbow.
Screw the shower head (A) on to the shower arm
(B).
B
A
F
F
I
G
1-1/2 in.- 2 in.
(38 mm- 51mm)
Tabla de contenido
loading

Este manual también es adecuado para:

F1aa0005ob1000 029 9631000 029 9671000 029 968

Tabla de contenido