AC bayonet connector
52,5 (PE 55)
10
IPE 2700 - 5000 SN 05
Single-phase grid connection
L1
N
PE
2
3
Inverter 1
NOTE
Note pin assignment
The diagrams show the connections inside the AC connector, as indicated by the
cut-out at the PE connection.
The AC bayonet connector is approved for cable sheath diameters between 13 mm
and 20 mm.
The following sequence must be observed during assembly:
1. Strip the voltage-free line and the wire ends.
NOTE
For lines with a cable sheath diameter from 16 to 20 mm, the cable gland must be
adapted accordingly. To do this, cut out the inner section of the blue sealing ring.
2. Slide the cable gland and the plug housing onto the cable.
3. Connect the wire ends to the plug terminals in accordance with the pin assign-
ment. Tightening torque: 0.7 Nm.
CAUTION
Observe the pin assignment of the AC bayonet connector. An incorrect assignment
can result in the unit being destroyed. The diagram shows the connections inside the
AC connector. as indicated by the cut-out at the PE connection.
1
2
1
4
3
4
Inverter 2
Installation
2
1
3
4
Inverter 3
37
Tabla de contenido
loading

Productos relacionados para Schüco IPE 2700 SN 05

Este manual también es adecuado para:

Ipe 3000 sn 05Ipe 3600 sn 05Ipe 4500 sn 05Ipe 5000 sn 05

Tabla de contenido