Water Piping And Fitting; Electrical And Wiring - McQuay C Serie Manual De Instalación

Acondicionador refrigerado por aire
Ocultar thumbs Ver también para C Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 77
All water pipe must be adequately insulated to prevent capacity losses and condensation.
Install a 40 to 60-mesh strainer to ensure good water quality.
Water pipes recommended are black steel pipe and copper pipe.
During installation, the piping of the unit should be clamped before rotating the installation pipe to reduce the moment
induce on the piping.
Users are recommended to install the pipes and accessories as shown in Figure 6.
An air vent must be installed at the highest position, while a drainage plug at the lowest position of the water circuit. After
the leak test (0.6MPa), open the air vent to release any air trapped in the water circuit.
Run the clean water through the water inlet and operate the pump to drain out the dirty water. Clean the strainer after
running the pump for 30 minutes.
Fill up the water circuit after connecting the pipes and equipment. Check water leakage at all connections and joints. Do
not start the unit when the system is leaking.
To optimize the capacity of the system, ensure that the system is free of air bubbles. The air trapped in the system would
make the system unbalanced.
4AC/AC 20/25/30 C/CR
4AC/AC 40/50/60 C/CR
Do not allow water to remain in the water pipes if the unit is not operating for a long period.
Water must be drained out if the unit is not running during winter. Failing to do so would cause the pipe to crack.
Do not drink the chilled water in the unit.
Refer to the wiring diagram provided on the unit when making electrical wiring.
Do not ground any electrical equipment to the water piping.
Install an external isolator switch (if it is not provided) to prevent electrical shock.

WATER PIPING AND FITTING

PRESSURE GAUGE
GATE
GATE
VALVE
VALVE
GATE
BALANCING
THERMOMETER
VALVE
VALVE
GATE VALVE
THERMOMETER
FLEXIBLE
PRESSURE GAUGE
GATE
GATE
VALVE
VALVE
GATE
BALANCING
THERMOMETER
VALVE
VALVE
BALANCING
GATE VALVE
THERMOMETER
VALVE
STRAINER
FLEXIBLE
CHECK
! ! ! ! ! CAUTION

ELECTRICAL AND WIRING

1-7
AIRVENT (INSTALL
HIGHEST POSITION)
BALANCING
GATE VALVE
BYPASS VALVE
P
VALVE
(DIFFER ENT PRESSURE TYPE)
STRAINER
GATE VALVE (LOWER
CHECK
POSITION FOR DRAINAGE)
VALVE
MAKE UP
VALVE
AIRVENT (INSTALL
HIGHEST POSITION)
BYPASS VALVE
GATE VALVE
P
(DIFFER ENT PRESSURE TYPE)
GATE VALVE (LOWER
POSITION FOR DRAINAGE)
VALVE
MAKE UP
VALVE
FAN COIL UNIT/AIR HANDLING UNIT
FAN COIL UNIT/AIR HANDLING UNIT
Figure 6
Tabla de contenido
loading

Tabla de contenido