3. Installation and Setup
10) Install another 2 battery packs to the layer (L6). Be sure to
11) Reattach the six battery bracket bars removed in step 2.
keep terminal sides of all batteries down.
12) On the right side of the UPS, use 30 pieces of cable
1
to connect two terminals on all batteries shown below.
1
13