CO-190-PR/CO-1190-PR
8"
8"
(203)
(203)
Strainer Size
Strainer Size
3/4"
3/4"
(19)
(19)
Pipe Size
Pipe Size
CO-190-PR-60 & CO-1190-PR-60
3/4"
3/4"
(19)
(19)
1. Leader Pipe
Leader pipe should be cut so that the height of the finished cleanout is at or just
below the height of the finished floor. The leader pipe should be cut evenly with no
burrs or debris attached.
8"
8"
(203)
(203)
Strainer Size
Strainer Size
Pipe Size
Pipe Size
0-1" Adj.
0-1" Adj.
Post-Pour
Post-Pour
Chart A
Chart A
Min./Max.
Min./Max.
Pre-Pour
2 13/64"
2 13/64"
Pre-Pour
(56)
(56)
4 7/16"
4 7/16"
(113)
(113)
Post-Pour
Chart A
Chart A
Min./Max.
Min./Max.
Pre-Pour
Pre-Pour
2 1/8"
4 1/4"
4 1/4"
(108)
(108)
Cleanout Body
Cleanout Body
Leader Pipe
Leader Pipe
3
0-1" Adj.
0-1" Adj.
Post-Pour
2 1/8"
(55)
(55)