Installation; Inside Mount - Levolor Roman Shades Instalación

Ocultar thumbs Ver también para Roman Shades:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION

INSIDE MOUNT (IM)
Bracket
Bracket
STEP 1: MARK THE BRACKET LOCATIONS
IMPORTANT: Before marking bracket locations, ensure that your bracket
placement will not interfere with any components inside the headrail.
Verify that your window casing has a minimum depth of ½" which allows for a
partially recessed headrail mount.
If flush mount (fully recessed mount) is desired, a minimum mounting depth of
2
" is required.
1
8
Mark 1 - 2" from each jamb for bracket location.
With a pencil, mark the longer, oblong drill hole locations through the top of the
holes of the bracket, 2 holes per bracket.
If more than two installation brackets come with your order, space additional
bracket(s) evenly between the two end brackets, no more than 30" apart, and
mark drill hole locations.
8
Cordless Lift Control
19-0050-030 Romans Install Guide-Cordless_F_070720.indd 8-9
INSIDE MOUNT (IM)
Bracket
Bracket
Screw
Screw
STEP 2: INSTALL THE BRACKETS
Pre-drill screw holes using a
" drill bit (wood and metal mounting surfaces only)
1
16
using pencil marks as a guide.
Hold the bracket with the surface marked "Top" facing up. Line up the pre-drilled
screw holes and the longer, oblong holes in the bracket.
While holding the bracket in place, secure the bracket with screws, 2 screws
per bracket.
Repeat for each bracket.
Ensure all brackets are square with each other.
INSTALLATION
9
Cordless Lift Control
7/7/20 9:11 AM

Capítulos

Tabla de contenido
loading

Tabla de contenido