Fig. 13c
A-FRAME ATTAcHEs
HERE
x4
Fig. 13a
Loc Nut
Washer
4-1/4''
Swing Hanger
Two Child Swing
Fig. 13
Fig. 13b
Fig. 13d
2''
Carriage Bolt
per bracket
Two Child Swing Supports:
Note: Use (2) 2'' x 4'' x 20'' Boards Included In
Your Kit.
1. Drill two 2'' x 4'' x 20'' supports as indicated in
32-1/2''
(Fig. 13).
2. Attach four swing hangers to the supports using 5/16''
flat washers and loc nuts as shown in (Fig. 13a).
3. Place Bolt Covers over the top of the swing hangers and
loc nuts. Secure to the supports using 2-1/2'' screws per
Bolt Cover, as shown in (Fig. 13b).
4. Along top of Swing Beam mark placement for Two Child
Swing Supports as shown in (Fig. 13c).
14-1/2''
5. Position four beam brackets (right and left) in position on
beam making certain the outside of the braces are 18''
apart and the nailing edge of the bracket is flush with the
top of the beam (Fig. 13d). Attach using three 2-1/2''
screws per bracket.
6. Center supports across beam, mark and drill 3/8'' holes
(Fig. 13d).
7. Attach using two 2'' Carriage bolts, 5/16" flat washers
and loc nuts per bracket (Fig. 13d).
23
Assembly Instructions
side view
Drill 3/8" Holes
20"
top view
16"
(2) 2-1/2'' screws
Bolt Cover
Loc Nut
Washer
(3)
2-1/2''
screws
18"
2"