Water Connection - Lamborghini Caloreclima Xilo 20 MC W TOP Manual Para La Instalacion Y El Mantenimento

Caldera mural a gas - alto rendimiento - modulante
Ocultar thumbs Ver también para Xilo 20 MC W TOP:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

WATER CONNECTION

Fit the supporting hooks and attach the assembly template, moving it up to the wall; fit all the pipes, starting
with the end pipe fittings already mounted on the template: system supply, system return, cold water, hot
water, any gas pipes and electric mains leads with room thermostat.
Once the pipes have been fitted, the end pipe fittings can be removed and ordinary caps fitted, ready for
hydraulic tests to be carried out. The template can be removed or, if left in place, will be embedded in the
wall once finishing operations have been completed (plaster and tiles); only the two supporting hooks will
protrude from the wall, as well as an opening for the connections. Attach the boiler to the hooks through the
holes at the back of the frame, pushing it up against the finished wall. Make the necessary hydraulic
connections.
ADVICE AND SUGGESTIONS ON PREVENTING SYSTEM VIBRATION AND NOISE.
-
Do not use pipes of reduced diameter.
-
Do not use low-radius elbows or fittings that significantly reduce cross-section.
-
Hot-flushing of the system is recommended in order to eliminate any impurities from the piping and
radiators (especially oil and grease) which might damage the circulator.
LEGEND
G
Hot water Ø 1/2"
C
Gas Ø 1/2" - Ø 3/4" (see cock
supplied with the boiler)
F
Boiler water supply Ø 1/2" (cold)
AE
Electrical supply
System delivery Ø 3/4"
M
R
System return Ø 3/4"
GS
Holding hooks Ø10 mm
NOTE:Provide female water connections.
440
384
28
GS
M
C
G
F
AE
98
130,5
162
220
278
342
440
28
R
98
44
Tabla de contenido
loading

Este manual también es adecuado para:

Xilo 20 mcs w top

Tabla de contenido