Moving The Machine; Installation - NAMCO WANGAN MIDNIGHT Manual Del Operador

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10
4.

MOVING THE MACHINE

This machine is fitted with castors to make it easier to move. Take
l
care when moving the machine on an inclined surface.
The overall height of this machine is 1990mm. Take care of any
l
overhead obstructions. (e.g. Light Fittings, Electric Cables etc.)
When moving the game , ensure that the game is dis-assembled
l
into 4 parts: Monitor Cabinet, Header Assembly and Seat
Assemblies.
5.

INSTALLATION

Notes on Installation
WARNING
WARNING
WARNING
CAUTION
NOTE
NEVER turn the power to the machine ON until installation
has been completed.
In order to prevent possible electric shocks, be sure that the
machine is connected to the mains with a securely connected
earthed plug.
So that customers are not injured , ensure that there is at
least 500mm separation between other machines or walls.
In order to avoid damage to the machine due to mis-operation,
ensure that the voltage of the mains supply is 230volts AC.
If the location site of this machine has a polished floor it is
recommended that rubber pads are fitted under the level adjusters
to prevent the machine sliding on the floor.
In order to gain access to the Power Supply and CPU assemblies,
make sure that the rear of the machine is separated from a wall
or other machine by at least 500mm.
When installation is complete, it is imperative that the game is
initialized.
(See section 7 page 59)
Page 32
Tabla de contenido
loading

Tabla de contenido