Installation Area Overview; Ac Connection - SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

SMA Solar Technology AG

5.8 Installation Area Overview

A
Figure 20: Terminals in the installation area
PELV (safe to touch)
B
Device grounding
G
Ethernet interface x 2
H
RS485 interface (not in use)
Live parts
A
AC terminals
E
PV terminals
Misc
C
AC overvoltage protection (SPDs)
D
DC overvoltage protection (SPDs)
F
DC load-break switch
Installation Guide
B
H
G
D
C

5.9 AC Connection

IMI Detection
The inverter has a built-in IMI/RCMU (Insulation
Monitoring Interrupter / Residual Current Monitoring
Unit). The inverter acts on residual DC current and a
sudden change in the ground fault current. This
functionality is activated during normal operation.
Insulation Resistance Detection
The inverter has a built-in insulation resistance
detection. The insulation resistance detector performs
a measurement of the connected PV system
resistance to ground before the inverter connects to
the utility grid. If the resistance is below the grid code
set value, the inverter will wait and re-measure the
resistance after a short while. If the resistance is
above the grid code setpoint, the inverter performs a
self-test and connects to the utility grid.
SHP75-10-STP60-10-IA-xx-19
5 Installation
E
F
27
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sunny tripower 60Shp 75-10Stp 60-10

Tabla de contenido