Install Plumbing; Tower Mounting Frame Preparation; Install The Tower Mounting Frame - Kohler K-1025-H2 Guia De Instalacion

Ocultar thumbs Ver también para K-1025-H2:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Mounting
Studs
Drywall
Screw
2-3/8"
(6 cm)

5. Install Plumbing

CAUTION: Risk of damage to the footbath bottom and subfloor. Ensure a watertight seal on the
footbath drain connections.
When the footbath is securely positioned, connect and leak test the drain and fittings. Make sure to
plug the suction line if the pump is not yet attached.
NOTE: An access panel will simplify future maintenance.

6. Tower Mounting Frame Preparation

The location of the tower mounting frame is critical. Be precise with this measurement.
Measure 2-3/8" (6 cm) from the deck surface of the footbath to the tower mounting stud. Draw a
pencil line at that location.

7. Install the Tower Mounting Frame

Remove the three 3/8" tower bolts and carefully lift the tower out of the mounting frame. Carefully
set the tower aside where it will not be damaged.
Position and level the mounting frame between the tower mounting studs and align the bottom
metal edge with the pencil line you drew on one of the studs.
Secure the mounting frame to the tower mounting studs with the 10 provided drywall screws.
1032110-2-E
Mounting
Frame
Pencil Line
Nailing-In
Flange
8
Bolts
Bolt
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-1030K-5162

Tabla de contenido