Before You Begin; Tools And Materials - Kohler K-1025-H2 Guia De Instalacion

Ocultar thumbs Ver también para K-1025-H2:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Before You Begin

IMPORTANT! The hydro-massage system is intended for indoor use only.
IMPORTANT! The stud supports must be within 3/8" (1cm) of plumb. The door enclosure is designed to
fit the footbath. Proper door assembly and operation depends upon installation of the footbath against
square and plumb studding.
The hydro-massage system operates at flow rates up to 80 gallons (302 L) per minute. To achieve a
watertight installation, it is critical that you follow all the installation instructions carefully. Pay
particular attention to leveling and sealing details to obtain a satisfactory installation.
It is critical that you follow the installation sequence and details in the steps that follow to
successfully install and operate your system, and to prevent costly repairs and rework.
Kohler Co. shall not be responsible for leakage that occurs as a result of inadequate or poor
assembly or installation techniques.
All information in this manual is based on the latest product information available at the time of
publication. At Kohler, we constantly strive to improve the quality of our products. We reserve the
right to make changes in product characteristics, packaging or availability at any time without
notice.

Tools and Materials

Silicone
Sealant
Masking
Shims
Tape
1032110-2-E
Measuring
Tape
Level
Safety
Drill Bits
Glasses
Claw
1-5/8" Carbide
Hole Saw
Hammer
4
Plus:
• Conventional Woodworking
Tools and Materials
• Plumbing Tools and
Equipment
• Drop Cloth
• 2x4s or 2x6s
• Plywood
• Cement Board
• Solvent Welding Solution
• Pencil
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-1030K-5162

Tabla de contenido