Load Control - Vimar By-me Guía De Usuario

Sistema domótico
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 124

Load control

10. LOAD CONTROL.
The load control function can be used to monitor the instantaneous amount of mains power being
consumed, and so prevent the miniature circuit breaker from being tripped due to overload, by dis-
connecting the controlled loads if necessary (up to at most 8).
When the total system consumption returns to be less than the value set in the control panel, the
disconnected services will be reactivated after a safety time set by the installer.
15.01.2011
Main menu
To call up
Loads
the Application
press
.
corresponding
Button
Logout
Setup
Main menu  Others
(press button D on the control panel)
button C)
• Press
to view a log of the deactivations/activations of the loads managed; this is useful
Events List
to check the overloads detected by the system.
• Press
Disconnected zones
them.
• Press
Operation
to choose the load management according to the following modes:
-
Auto OFF-ON
: automatic load connection or disconnection depending on the amount of power
consumed.
-
Auto OFF Man ON
-
load always connected irrespective of the power consumed.
Always ON:
-
Always OFF
: load always disconnected irrespective of the power consumed.
• Press Forced zones to view the zones "forced ON". A classic example are the loads that should
remain temporarily always on (the oven to be able to cook even if other loads are in operation, the
hair-dryer, etc.).
05:57
Others
to view the loads currently deactivated and then to be able to reactivate
: automatic load disconnection and subsequent manual connection.
Events List
Operation
Menu
Setup
Fig. 20
 Others
(press button C)
Load Control
15:09
Detached Zones
Load status
Forced Zones
Status Off 01
Forced On 00
Status On 00
 Loads
(press
57
57
Tabla de contenido
loading

Tabla de contenido