Installation And Operation; Instructions For The Installer; Safety Instructions - Bartscher 280PRO Manual Del Usuario

Ocultar thumbs Ver también para 280PRO:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 77

5. Installation and operation

5.1 Instructions for the Installer

CAUTION!
Any installation, connection and maintenance work must be performed only
by the qualified, possibly authorized personnel, who meets the following
requirements:
a) approved by our company:
b) certificate of the local gas supplier.
Apart from these requirements, the following regulations must be observed:
1) DVGW TRGI (Technical regulations regarding gas installations);
2) TRF (Technical regulations regarding the liquid gas);
3) DVGW G 631 (Installation of commercial kitchen appliances of gas
fuel combustion).
Furthermore, relevant provisions of the Building Code and Commercial Law,
HSE and VDE regulations must be observed.
CAUTION!
Incorrect installation, maintenance, cleaning or changes introduced to the
device may lead to severe injuries or death or damage the device.

5.1.1 Safety instructions

1. Make sure that the gas supply at the installation site is sufficient for the operation of
the device.
2. Before the test run of the device, place it in a well-ventilated room and remove any
inflammable materials from its surroundings.
3. Before starting the device, inspect the installation for leakages using soapsuds (leak
detection spray). Cover the pipe joints and connections with soapsuds. Leaks will
become visible through air bubbles forming on pipe joints and connections. As an
alternative, you may observe the gas meter. No movement on the gas meter indicates
that there is no gas leakage. Never use open flame to test gas pipes for leaks!
4. Before cleaning or maintenance of the device, disconnect the gas supply from the
device at the safe place (close the gas shut-off valve!).
- 39 -
Tabla de contenido
loading

Este manual también es adecuado para:

1050603

Tabla de contenido