Maintenance and repair procedures / Procedimientos de mantenimiento y reparación
GB
• Clamp the hose reel firmly to a work bench.
• Pre tension the hose reel power spring by rotating the spool:
10 m (33') spring: 16 turns
15 m (49') spring: 19 turns
15 m (49') HD spring: 21 turns
• Introduce the hose end to fix to the hose reel through the
outlet guide and then through the opening in the drum of the
spool. Pull the hose through the drum towards the swivel.
• Fix the hose to the swivel as indicated in figure 8a and fix the
U bolt as shown in figure 8b.
• Fix the hose stop to the free end of the outlet hose.
• Pull out the hose slightly to free the spool latch and then gradually
release the hose to allow the hose reel to wind up the hose.
• If the hose reel does not rewind satisfactorily then adjust the
tension of the power spring (see "Spring load adjustment").
Samson Corporation • One Samson Way • N.C. 28778 Swannanoa • Phone: 00 1 8286868511 • Fax: 00 1 8286868533
Hose installation / Instalación de la manguera
• Sujetar el enrollador a una base firmemente.
• Aplicar, al enrollador sin manguera, las vueltas de pretensión
• Introducir el extremo de la manguera por la salida del
• Fijar la manguera a la rótula como se indica en la figura 8a y
• Colocar el tope de manguera en el extremo libre.
• Liberar el trinquete tirando ligeramente de la manguera y dejar
• Si es necesario ajustar la tensión del resorte, seguir las
E
que se indican a continuación.
resorte para 10 m (33'): 16 vueltas
resorte para 15 m (49'): 19 vueltas
resorte para 15 m HD (49'): 21 vueltas
enrollador y el orificio del tambor hasta llegar a la rótula.
colocar el abarcón según la figura 8b.
que enrolle suavemente.
instrucciones del apartado "Ajuste de la tensión del resorte".
R. 11/12 850 824
3