Site Preparation - Kohler K-4108BR Guia De Instalacion

Ocultar thumbs Ver también para K-4108BR:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

965 mm (38") -
1676 mm (66")
Docking
Station

2. Site Preparation

If applicable, remove the existing toilet seat.
Turn off the room's water supply.
Flush the toilet to relieve any pressure from the water supply
hoses.
Disconnect the water supply hose from the toilet fill valve.
Determine the installation location for the remote control docking
station.
1194356-BR2-A
914 mm
(36")
English-4
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-76421br

Tabla de contenido