EN
PACKING
- The body, handle and other parts of the jack are packed in a three-layer corrugated cardboard box with pallet;
the operating and maintenance manual plus the warranty certificate in a folder are also inside the box.
- The instruction "Keep upright" is clearly visible on the cardboard box containing the jack.
- Depending on the number of jacks shipped, pallets of different sizes are used.
- Either transpallets or forklift-trucks are used for handling.
PUTTING INTO OPERATION
UNPACKING
Use the eyebolts and suitable equipment only to remove the jack from its packaging.
CONNECTION TO THE COMPRESSED AIR SYSTEM
- Compressed air enters into the jack circuit through the quick coupling on the top of the manual lifting/
descending controls; it is therefore necessary to have a connecting pipe with a quick coupling compatible with
that of the jack. Check that the air supply pipe has a useful passage of at least 6 mm and it is not pinched or
restricted anywhere. DWG. 4
WORKING AIR PRESSURE: 8 - 10 BAR
- Absolutely never put the following into the compressed air circuit: hydraulic or Vaseline oil, brake liquid,
kerosene or other liquids.
-Install a filter dehumidifier-lubricator unit in the compressed air system.
- If you want to lubricate the compressed air circuit use exclusively:
AGIP OSO 100; MOBIL DTE 27; ESSO TERESSO 100;
SHELL TELLUS 100; BP ENERGOL HP 100
14