Keep the packaging for at least the duration of the warranty period, for any shipments to the after-sales
centre for repairs. Dispose of packaging in compliance with the regulations in force regarding waste dis-
posal.
1.4 - APPLIANCE COMPONENTS DESCRIPTION
The main components of the air conditioner are shown in figure A.
1. Air outlet deflector (Flap)
2. function and alarms display console
3. air suction grille
4. Air filter
5. Purifying filter and active carbons filter
6. Condensate discharge
A
3
4
2
1
2 - INSTALLATION
2.1 - Size and specifications of the room in which to install the air conditioner
•
Before installing the air conditioner, it is essential to make an accurate calculation of the heat load in
summer (and cold load in winter for models with heating pump) at the site of installation.
•
The more accurate this calculation is made the better the air conditioner will be able to do its job.
•
When executing the calculations, refer directly to the prevailing standards.
•
For particularly important applications, we recommend contacting expert heating engineers.
•
The user should try to limit high heat loads as much as possible as follows: glass doors and windows
exposed to many hours of sunlight should be fitted on the inside with curtains or, even better, on the
outside with coverings such as Venetian blinds, verandahs, refractive film, etc.). The air-conditioned
room must remain closed as long as possible.
•
Halogen spotlights or other electrical equipment with high power consumption should not be used in the
room (toasters, steam irons, hot plates for cooking, etc.).
EN - 10
5
9
6
7. emergency condensate discharge
8. Power cord
9. Guard
10. SPlit unit connection terminal board
11. Gas pipe taps
10
11
7
1
8
3
9
4
2
8