Beretta QUADRA GREEN 25 R.S.I. Manual De Instalacion Y Uso página 26

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

QUADRA GREEN 25 R.S.I.
4.7 Adjustments
The boiler has already been adjusted by the manufacturer during produc-
tion. If the adjustments need to be made again, for example after extraordi-
nary maintenance, replacement of the gas valve, or conversion from meth-
ane gas to LPG, observe the following procedures.
The adjustment of the maximum and minimum output, and of the maximum
and minimum heating and of slow switch-on, must be made strictly in the
sequence indicated, and only by qualified personnel only:
- disconnect the boiler from the power supply
- turn the heating water temperature selector to its maximum
- loosen the fixing screws (E) on the instrument panel (fig. 14)
- lift then turn the instrument panel towards you
- loosen the fixing screws on the cover (F) to access the terminal board
(fig. 16)
- insert the jumpers JP1 and JP3 (fig. 39)
- power up the boiler.
The three LEDs on the instrument panel flash simultaneously and the
display shows "ADJ" for approximately 4 seconds.
Next change the following parameters:
1. Domestic hot water/absolute maximum
2. Minimum
3. Heating maximum
4. Slow ignition
as follows:
- turn the heating water temperature selector to set the required value
- using a small screwdriver included, press the CO button (fig. 26) and
then skip to the calibration of the next parameter.
Live electrical parts.
The following icons light up on the monitor:
1.
during domestic hot water/absolute maximum calibration
2.
during minimum calibration
3.
during heating maximum calibration
4.
during slow ignition calibration
End the procedure by removing jumpers JP1 and JP3 to store these set
values in the memory.
The function can be ended at any time without storing the set values in the
memory and retaining the original values as follows:
- remove jumpers JP1 and JP3 before all 4 parameters have been set
- set the function selector to
- cut the power supply 15 minutes after it is connected.
Calibration can be carried out without powering up the boiler.
By turning the heating selection knob, the monitor automatically
shows the number of rotations, expressed in hundreds (e.g. 25 =
2,500 rpm).
The function for visualizing the setting parameters is activated by the function
selector in summer and in winter, by pressing the CO button on the circuit
board, either with or without request for heat.
This function cannot be activated when connected to a remote control.
Upon activating the function the setting parameters are visualized in the
order given below, each for 2 seconds. Each parameter is displayed together
with its corresponding icon and fan rotation speed measured in hundreds.
1. Maximum
2. Minimum
3. Max. heating
4. Slow ignition
5. Max. preset heating
GAS VALVE CALIBRATION
- Connect the boiler to the power supply
- Open the gas tap
- Set the function selector to
- Loosen the screws (E), remove the housing, then lower the instrument
panel towards you (fig. 14)
- Loosen the fixing screws on the cover (F) to access the terminal board
(fig. 16)
- Using a small screwdriver included, press the CO button (fig. 26).
Live electrical parts.
- Wait for burner ignition. The display shows "ACO" and the yellow LED
flashes. The boiler operates at maximum heat output.
The "combustion analysis" function remains active for a limited time (15
min); if a delivery temperature of 90°C is reached, the burner is switched
off. It will be switched back on when this temperature drops below 78°C.
- Insert the analyser probe in the ports provided in the air distribution box,
after removing the screws from the cover (fig. 40)
- Press the "combustion analysis" button a second time to reach the number
of rotations corresponding to the maximum domestic hot water output
(table 1); the yellow LED continues to flash while the red LED is fixed
26
(OFF/RESET)
(OFF/RESET) (monitor off)
- Check the CO
value: (table 3) if the value does not match the value
2
given in the table, use the gas valve maximum adjustment screw
- Press the "combustion analysis" button a third time to reach the number
of rotations corresponding to the minimum output (table 2); the yellow
LED continues to flash while the green LED is fixed
- Check the CO
value: (table 4) if the value does not match the value
2
given in the table, use the gas valve minimum adjustment screw
- To exit the "combustion analysis" function, turn the control knob
- Remove the flue gas probe and refit the plug
- Close the instrument panel and refit the housing.
The "combustion analysis" function is automatically deactivated if the board
triggers an alarm. In the event of a fault during the combustion analysis
cycle, carry out the reset procedure.
table 1
MAXIMUM NUMBER OF
FAN ROTATIONS
Heating - DHW
table 2
MINIMUM NUMBER OF
FAN ROTATIONS
table 3
Max. CO
2
table 4
Min. CO
2
table 5
SLOW IGNITION
If the CO
values do not correspond to the values in the Multigas
2
table, make further adjustments.
4.8 Gas conversion (fig. 41-42)
Gas conversion from one family of gases to another can also be easily
performed when the boiler is installed.
This operation must be carried out by professionally qualified personnel.
The boiler is designed to operate with methane gas (G20) according to the
product label.
It is possible to convert the boiler to propane gas, using the special kit.
For disassembly, refer to the instructions below:
- switch off the power supply to the boiler and close the gas tap
- remove in sequence: housing and air distribution box cover
- remove the fixing screw from the instrument panel
- unhook and turn the instrument panel forwards
- remove the gas valve (A)
- remove the nozzle (B) inside the gas valve and replace it with the nozzle
from the kit
- refit the gas valve
- remove the silencer from the mixer
- open the two half-shells by prising apart the corresponding hooks (C)
- replace the air diaphragm (D) in the silencer
- refit the air distribution box cover
- re-power the boiler and turn on the gas tap.
Adjust the boiler as described in the chapter entitled "Adjustments" with
reference to the information on LPG.
Conversion must be carried out by qualified personnel.
Once the conversion is complete, affix the new identification
label supplied in the kit.
METHANE
LIQUID GAS
GAS (G20)
(G31)
49 - 61
49 - 61
METHANE
LIQUID GAS
GAS (G20)
(G31)
14
14
METHANE
LIQUID GAS
GAS (G20)
(G31)
9,0
10,5
METHANE
LIQUID GAS
GAS (G20)
(G31)
9,5
10,5
METHANE
LIQUID GAS
GAS (G20)
(G31)
40
40
rpm
rpm
%
%
rpm
Tabla de contenido
loading

Tabla de contenido