Connecting Control Voltage Cables; Configuration Of The Installation; Configuring The Bow And / Or Stern Thruster - Vetus BOW PRO Serie Instrucciones De Instalación

Ocultar thumbs Ver también para BOW PRO Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 57
5.6

Connecting control voltage cables

• Mount the control panel at the helm position. There must be 150
mm of free space behind the panel.
• Connect the panel as shown in the dia-
gram.
See diagrams on page 144 if several pan-
els have to be connected.
• Connect the motor's control voltage cable
to the connection box.
• Connect the hub to a 12-Volt power sup-
ply.
N
OTE
The hub should also be connected to 12
Volts in the case of a 24-Volt bow thruster.
6

Configuration of the installation

Both the panels and the bow thruster / stern must be configured correctly.
6.1

Configuring the bow and / or stern thruster

Bow thruster
If only one (1) bow thruster is installed configuration is not necessary.
Stern thruster
If only one (1) stern thruster is installed configuration is not neces-
sary, but consider the stern thruster panels as bow thruster panels
when configuring.
Bow thruster + Stern thruster
The default configuration is for use as a bow thruster.
Only the configuration of the stern thruster must be adapted.
Configure a stern thruster by cutting the red cable as shown in the
drawing.
30
020806.01
Control panel
Terminator
Connection cable
Hub
24 V
+
12 V
Control voltage fuse
vetus® Installation instructions BOW PRO Series Thrusters: BOWA0651, BOWA0762 and BOWA0902
- BPPJA
- BPPPA
Connection box thruster
Connection cable
CAN-bus supply
Rood
Tabla de contenido
loading

Este manual también es adecuado para:

Bowa0651Bowa0762Bowa0902

Tabla de contenido