Final Assembly - Vetus BOW PRO Serie Instrucciones De Instalación

Ocultar thumbs Ver también para BOW PRO Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 57
4.3

Final assembly

• Grease the propeller shaft with 'outboard gear grease' and install
the propeller.
1
2
The propeller should run a minimum of 1.5 mm (
thrust tube wall, around the complete circumference.
• Slide the flexible coupling onto the output spindle of the electric
motor as far as necessary to allow the end of the output spindle
(A) and the underside of the flange (B) to become aligned.
• Tighten the lock-screw (C) to the specified torque.
• Grease the input shaft with an installation compound, such as
'Molykote® G-n plus' .
• Grease the threads of the fastenings bolts with 'outboard gear
grease' and install the electric motor to the intermediate flange.
• For a first check, turn the propeller by hand - it should turn easily,
while connected to the output spindle of the electric motor.
vetus® Installation instructions BOW PRO Series Thrusters: BOWA0651, BOWA0762 and BOWA0902
Outboard Gear
Grease
3
1
/
") free of the
16
4
Outboard Gear
M10
20 - 25 Nm
(15 - 18 ft.lbf )
ENGLISH
5
PH2
M5
2.5
3 Nm
(2.2 ft.lbf )
Grease
17
Molykote® G-n plus
27
020806.01
Tabla de contenido
loading

Este manual también es adecuado para:

Bowa0651Bowa0762Bowa0902

Tabla de contenido