EN
7. Start-up
7.1 General information
Before the system start-up, both the lubri-
cant cartridge and the DIP switch positions
have to be verified with the intended use.
In addition, the electric and hydraulic con-
nections are to be checked.
Prior to commissioning, ensure that:
○ the grease in the lubricant cartridge is
suitable for the intended purpose.
○ the correct cartridge size is set.
○ the correct dispensing time is set.
○ the system has been ventilated.
○ a reset procedure has been carried out.
○ all electrical and hydraulic connections
are correctly connected.
○ bayonet plug and if applicable the battery
compartment are correctly mounted.
32
7.2 Switching on
Set the DIP switch to the ON position.
Activate the TLMR Fig. 27
ON
ON
DIP
1
2
3
4
7. Start-up