Maintenance
Weekly Preventive Maintenance
Checklist
____________________________
Machine
___________________________
Operator
Disconnect power to the machine before performing the weekly maintenance procedures.
1. Check the machine for leaks:
a. Start an unloaded cycle to fill the machine.
b. Verify that door and door gasket do not leak.
c. Verify that the drain valve is operating.
2.
3.
4.
5.
6.
7.
44
Checks
Observe All Safety Warnings!
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Month __________
Week Ending:
/
/
/
/
/
F232102