GE Advantium CSB923 Instrucciones De Instalación página 6

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

IMPORTANT:
Always maintain 36-3/4" minimum height from the floor to the cutout in any single or combined
installation.
PREPARE THE OPENING
Installation over a Wall Oven:
30"
17-1/2"
45-1/4"
Min.
• If you are replacing an electric double oven with the
combined installation of an Advantium 240V and a
single oven, use the dimensions shown. The middle
rail separating the two openings may need to be
larger than the 2" minimum shown.
6
Installation Preparation
(CONT.)
23-1/2"
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported by
2x4 or 2x2
25-1/4"
Runners all
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
PREPARE THE OPENING
Installation over a Wall Oven and
Warming Drawer:
30"
25-1/4"
17-1/2"
45-1/4"
Min.
Per warming drawer requirement
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting the
cabinet load, in addition to the added weight of this
approximate 80-pound oven, plus additional oven loads
of up to 50 pounds or a total weight of 130 pounds.
(CONT.)
Construct
Solid Bottom
23-1/2"
Min. 3/8"
Plywood
Supported
by
2x4 or 2x2
Runners all
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
2" Min.
31-2000356 Rev. 0

Capítulos

Tabla de contenido
loading

Tabla de contenido