ssembly Plan
Fig. 14
Swing Beam Drill Locations
1. Flip 4'' x 4'' Swing Beam so Carriage Bolts point downward as shown in (Fig. 14) Swing Hangers must be
installed on the same face of the Swing Beam where holes were first measured.
2. Install the swing hanger onto the beam by sliding over two carriage bolts (refer to (Fig. 12) for placement) and
apply two washers and two loc-nuts per Swing Hanger. Make certain to orient swing hanger as shown
in (Fig 14).
Note: When attaching Quick Link, make certain threads are pointing up. This will help keep the Quick Link
from loosening over time.
4. Repeat for all four hangers.
WASHER
LOC-NUT
Quick link
24
WASHER
LOC-NUT