ssembly Plan
Fig. 10
(2)
2-1/2'' screws
per joint
2'' Lag screw
Frame 3
ssembly Cont.
1.
ttach Frame 3 ssembly to Tower as shown in (Fig. 10).
2-1/2'' screws
(3)
2'' lag screws
Per Bracket
(2)
1-1/4'' lag screws
Per Bracket
1-1/4'' Lag screw
(3)
NOTE: Upper screws are (2) 1-1/4''
Lag Screws, Lower screws are (3) 2''
per joint
Double check to make
sure structure is square
Frame 3
20
(2)
1-1/4'' Lag
(3)
2'' Lag
Lag Screws.
Tailor's Chalk
2-1/2'' screw